PTSC Downstream Port: 10°23’24” N 107°05’09” E
Infrastructure, Yard & Jetty Facilities
With 33 years of development, PTSC Supply Base is one of the leading units with integrated and synchronous infrastructure, including ports, yards, warehouses, workshops, fabrication areas, lifting equipment, and technical facilities, capable of comprehensively meeting the requirements of oil & gas, renewable energy, industrial, and logistics projects.
Technical Specifications
-
factory
-
tools_pliers_wire_stripper
Vung Tau channel: 14km long, 310m wide, -14m draft
-
verified_user
Dinh River channel: 6.5km long, 100m wide, -7m draft
-
anchor
Wharf: 753m long, -9.5m draft, vessel size 20,000 DWT
-
humidity_percentage
Semi-diurnal tide range: +3.8m
Terminal & Jetty
- Total berth length: 750 m, width: 26 m
- Equipped with heavy-duty skidways with load capacities exceeding 50 tons/m², supporting load-out and launching operations for oversized structures weighing up to 25,000 tons
- Water depth: -9.5 m, with a design capacity of 20,000 DWT
- Proven capability to accommodate vessels of over 50,000 DWT
Total project yard area: 34 hectares, including
- 27 hectares dedicated to project construction and fabrication activities
- 2 hectares allocated for corrosion protection workshop systems
- 5 hectares comprising pre-fabrication yards, workshop systems, and AutoFit facilities
Infrastructure
Total Logistic Base Area: 48.2 hectares, including:
- Offices, warehouses, and storage yards: 21.8 hectares
- Internal road systems: 16.0 hectares
- Workshop facilities: 7.8 hectares
- Port and berth facilities: 1.9 hectares
- Silo systems, cement, barite, and drilling fluid facilities: 0.7 hectares
Utilities
Industrial power system, backup generators, water supply and drainage systems, centralized wastewater treatment facilities, waste collection areas, etc.